03 / 05HEAVY INDUSTRIAL · ELECTROLYSIS HALLCHECKED · 22,000 tons

Electrolysis hall, Risk Category III

22,000 tons of process equipment on a verified load path

one unified model
~2,300 × 560 ft
one unified model
process equipment
22,000 tons
process equipment
per ASCE 7
Risk Category III
per ASCE 7
largest pile group
~11 piles
largest pile group
Sheet 2. Model by layers: pile field, cells, steel frame, roof

The project IFC is not published for this case. Stills from the checked model:

02SHEETS

03TASK

An electrolysis hall carrying electrolytic cells and overhead cranes, on poor soils and in a corrosive environment. There was no coordinated model of the foundations, the frame, the runways and the cell rows

INPUTS

Poor soils, a corrosive environment, Risk Category III per ASCE 7, electrolytic cells and overhead cranes

04WHAT WE DID

  1. 1

    Built one structural model for the whole hall

    foundations, frame, runways and cells coordinated

  2. 2

    Sized the pile groups load by load under each cell foundation

    up to ~11 piles where needed

  3. 3

    Used lighter foundations in the lower-load zones

    no uniform over-design

  4. 4

    Positioned the expansion joints by thermal and settlement analysis

    ~3 joints along the hall

05WHAT CHANGED

Model
no coordinated model
Pile groups
one typical group
Expansion joints
by rule of thumb
Load combinations
standard

More cases

All cases →

22,000 tons of equipment on a verified load path. Risk Category III