02 / 05AI DATA CENTER · STEEL FRAMECHECKED · STEEL −10%

AI data center on one steel frame

Structural schemes compared first. Steel procurement −10%

steel procurement
−10%
steel procurement
fabrication-ready
LOD 400
fabrication-ready
liquid-cooled GPU pods
NVL72-class
liquid-cooled GPU pods
end-plate connections
Bolted
end-plate connections
Sheet 4. Model by layers: foundations, GPU pods, steel frame, roof

Real IFC model of the project. Rotate it, cut it, click any element

02SHEETS

03TASK

A multi-story AI data center: stacked data halls with liquid-cooled GPU pods on every floor and dry coolers on the roof. The client wanted standard sections, fewer welds and pod placement that the structure can actually carry

INPUTS

Grid-connection conditions, liquid-cooled GPU pod loads on every floor, rooftop dry coolers, and the client's priority for standard sections and fewer welds

04WHAT WE DID

  1. 1

    Compared alternative structural schemes

    the lightest buildable one chosen

  2. 2

    Unified the section range

    one set of standard shapes

  3. 3

    Replaced most welds with bolted end plates

    faster erection, simpler fabrication

  4. 4

    Placed the GPU pods to structural capacity

    girder deflection checked under every pod row

  5. 5

    Detailed members and connections to LOD 400

    shop drawings and bolt lists from the model

05WHAT CHANGED

Steel procurement
baseline scheme
Sections
mixed profiles
Connections
mostly welded
Pod placement
by layout only