Qbriq
BIM + CD production · US AE, structural & MEP firms

Faster CDs, fewer clashes

BIM and construction documents for AE firms. From basis of design to a coordinated LOD 350 model in about two weeks, with your EOR in responsible charge.

Your EOR reviews & seals the IFC set Native Revit / Tekla Open IFC exchange
IMG SLOT 01 · swap for model render ABCDEF1234GRID C/2 · ROOF
SheetS-301 · Framing iso
LOD350
StatusFor EOR review
Up to14daysto an LOD 350 BIM model
Up to90%fewer drafting and production hours
 <1%model clashesREPLACE · define the base before publishing
 24%average construction cost reduction across our projects
How it works

Four steps from basis of design to a sealed IFC set

  1. 01 Kickoff

    Basis of design and scope

    You provide the architectural layout, geotechnical report and survey. Together we agree on scope, applicable codes and review criteria.

  2. 02 1 week

    Build and check

    Qbriq builds BIM and analysis models, runs calculations, checks code compliance and clashes, and prepares design options.

  3. 03 1–3 days

    Your EOR reviews

    Checks loads, calculations and code compliance, selects an option, marks up changes.

  4. 04 1–3 days

    Revise, approve, issue

    Qbriq addresses comments. Your EOR reviews and seals the IFC set.

Deliverables
  • LOD 350 BIM + analysis models
  • Structural calc package
  • S/A/M/E/P drawings
What's under the hood

What runs inside every model

Codes

Designs to the governing codes

Designs to IBC, ASCE 7, ACI 318, AISC 360 and AHJ requirements.

IBCASCE 7ACI 318AISC 360AHJ
Options

Alternatives your EOR can choose from

AI generates alternatives using typical details and local practice.

Optimize

Checked and quantified

Load checks, material takeoffs, cost comparison.

Native output

Files your team already uses

Revit / Tekla files, open IFC (openBIM) exchange.

.RVTTekla.IFC
Case studies

Two LOD 400 projects

IMG SLOT 02 · data center render, 16:9
Case 01 / Data center

LOD 400 ground-up design

−10%steel material cost
  • Compared structural options to maximize IT capacity within the program
  • Rationalized member sizes and fewer shop and field welds
IMG SLOT 03 · plant steel model, 16:9
Case 02 / Heavy industrial plant

LOD 400 structural model

Facility
669 × 433 ft (204 × 132 m) copper processing facility
Equipment
22,000 tons (20,000 t) of equipment loads verified
Piles
Pile group loads up to 1,738 kips (7,731 kN)
Risk cat.
Risk Category III
REPLACE · client logos or a reference quote, only with written permission Remove this block if none are approved
Your first project

Start with one pilot. Scale when it passes your QA/QC.

Validate the work against your own standards before committing to more.

  1. 01

    Start with your data

    ProgramSiteProcessConstraints
  2. 02

    We build a pilot

  3. 03

    You validate against your standards and QA/QC

  4. 04

    We scale under an MSA for follow-on projects

Try Qbriq on one live project.